E-Mail from the USA shows need for time consuming crane inspections

This is a good example of why tower cranes should be thoroughly examined, and more then just once or twice a year. Tower crane examinations require time and contractors are going to have to get used to it. - anonymous crane operator

A story for Scott

This crane operator, who after the deadly crane collapse in New York on May 30th., decided when he climbed his 450ft. tower crane that the first thing he was going to do was to check out the bolting system, what he found was distressing, heres part of the story, from Vertikal.net (6/2/08):
Don't put off till tomorrow, what you should do today

Before going to work at 5:15am I watched the news on the most recent NY crane accident and it was immediately apparent to me that the Slew-ring assembly had failed.

The image “http://www.vertikal.net/images/stories/006183.jpg” cannot be displayed, because it contains errors.The first thing I did when I got to the top of the 450ft (136m) of 2003, tower crane was check the slew-ring bolts with a 2lb beater using minimum force. There are two rows of bolts, each row having 59.

With the crane balanced off, I started with the top row (slew bearing) and when I struck the third bolt it moved (loose), I continued checking and when I came to the 28th bolt it broke in two! I then went back to the bolt that had movement and decided to remove it for inspection, which revealed a severe crack at the same location as the one that sheared off.

Because of finding two bolts with a similar failure and the likelihood that there could be many more, I immediately put the crane out of operation. The manufacturer has been contacted and we're trying to arrange for a "Factory Engineer" to come out and thoroughly examine ALL the bolts, and if needed oversee the replacement of ALL slew-ring bolts. Which is the only certain solution!The image “http://www.vertikal.net/images/stories/006184.jpg” cannot be displayed, because it contains errors.

I will admit that if not for this most recent event, I would not have gone through the extra effort/procedure needed to properly inspect a slew-ring. The typical way it's done by operators and inspectors is either just a "visual" while climbing through the slew-ring, or just a tap with a carpenters hammer, relying on your sense of sound to hear a difference between bolts.

The problem with this is that without balancing off the crane to ensure that the load on the bearing is distributed equally, you can't get a true sense that the bolts are equally tightened and torqued to the proper specifications. And that goes for mast bolts too!

Bottom line, it just doesn't tell the whole story, especially considering the potential for loss of life and property damage. These common, time-saving methods are just not enough for what's at risk. Like the old saying goes,” don’t put off till tomorrow, what you should do today"!

The image “http://www.vertikal.net/images/stories/006185.jpg” cannot be displayed, because it contains errors.This is a good example of why tower cranes should be thoroughly examined, and more then just once or twice a year. Tower crane examinations require time and contractors are going to have to get used to it.

I was recently talking to a third party tower crane Inspector and he boasted that he can inspect a crane in three hours, easy money! In general a good tower crane thorough inspection should take at "least" six to eight hours (depending on configuration). And with all due respect to OSHA and others, "they are the Jack of all trades and master at none", and cannot be expected to have detailed knowledge of tower cranes.